
Equipment
Brigade News: May 2008
April 29, 2008
By Fire Fighting in Canada staff
By Fire Fighting in Canada staff
brigade news
April 29, 2008
By Fire Fighting in Canada staff
By Fire Fighting in Canada staff
![]() |
The District of Hope Fire Department in British Columbia, under the command of Chief Tom DeSorcy, took delivery in February of a HUB-built pumper on a Freightliner M2 chassis with a Mercedes Benz 300-hp engine, an Allison 3500 EVS automatic transmission, a Hale QFLO125 pump and a Foam Pro 2001 foam system. It has Amdor doors, Akron valves and a Whelen lighting package. |
![]() |
The Delta Fire Department in British Columbia, under the command of Chief Gordon Freeborn, took delivery in November of a HUB-built command unit on a 2007 GMA TC5500 chassis, with a Duramax 300-hp engine, an Allison 1000 automatic transmission, a Whelen lighting package and an Onan 5.5KW generator. |
![]() |
The Rossland Fire Department in British Columbia, under the command of Chief Gerry Woodhouse, took delivery in October of a HUB-built apparatus on a 2007 Freightliner M2 4 x 4 chassis with a 300 hp Mercedes Benz engine, an Allison 300 EVS automatic transmission, a Hale QFLO 125 pump, a Foam Pro 2002 dual foam system, a Whelen lighting package, a Honda EM 3800 generator and Hub custom SCBA storage for eight bottles. |